University of Malta

UNIVERSITY OF MALTA 
INSTITUTE FOR ENERGY TECHNOLOGY
Triq il-Barrakki, Marsaxlokk, MXK 1531, Malta
TEL: (+356) 21650675/21652249      FAX: (+356) 21650615

 


 

 

 

Photovoltaic Grid-Connected Systems in Malta

 

Up to the end of 2005, this page had aimed to list as much as possible, all operating or pre-existing grid-connected solar photovoltaic systems in Malta.  In 2006, many more systems were installed in Malta and Gozo, and it was deemed impossible to track all installations.  However, the Malta Resources Authority, being the official entity in Malta, does keep records of all systems.  At the moment, the largest system is a 26.5 kWp installed at a private firm, which benefited from the Malta Enterprise grant ERDF co-financingt scheme 2008. 

 

Malta's total PV installed capacity has now reached 3 MWp (7.3Wp/capita) up to February 2010, out of which 230 kWp are installed in Public Buildings such as Government Buildings and public schools.

These systems are producing at least 4,500 MWh/annum (0.19% of the total electric energy generated in 2008), and are saving 3,951 tonnes of carbon dioxide per annum.

The currently installed PV capacity forms 2% of the total PV potential on rooftops for Malta.

At the moment, there are more than 70 companies that install PV systems.

Last updated on 27 April 2010.

Type

Rating (kWp)

Year (Start-End)

Location

Installer

Remarks

Fixed, c-Si, roof-top

1.8

1996-2003

Marsaxlokk

Charles Yousif

First demonstration for Malta. Discontinued in Jan. 2004

Tracking, c-Si, roof-top

0.36

2001

Marsaxlokk

Charles Yousif

First tracker in Malta

Fixed, c-Si, wall-mounted

1.5

2002

Madliena

Charles Yousif

First private-home owner

Fixed, c-Si, roof-top

3

2002

Marsa

Charles Yousif

First Installation in an industrial (factory) area

Fixed, a.c. modules, roof-top

0.14

2003-2004

Marsaxlokk

Charles Yousif

First ac module  system in Malta. Discontinued in 2004.

Fixed, c-Si, roof-top

2.3

2003

Madliena

Charles Yousif

Extension to first private-home owner

 Tracking on two-axis

0.55

2003

Attard

E. Mallia & B. Azzopardi

Manual Tracking

Fixed, c-Si, roof-top

1.5

2004

Tal-Ftieh, B'Kara

Private Contractor

First installation in a Housing Project of the Housing Authority

Fixed, c-Si, roof-top

1

2005

Xaghra

Daniel Talma

First grid-connected installation on Gozo

Fixed, c-Si, roof-top

2.5

2005

Fgura

Tip Top

First installation in a commercial building

Fixed, c-Si, roof-top

2.3

2005

Kappara
San Gwann

Private Home

Launched Sep. 2005